Pages

Tuesday, June 24, 2014

Beachin It!!!


Snakes on a plane...this has nothing to do with the Tate Residence but in honor of our flight into to BTR I thought I'd give it a shout out. 

Here are some progress pictures of the Mudroom Powder Room, the front and side entry doors installed, window seat framing, master bath shower, bonus room...






While the Tate's are in FL for a week in the sun, beachin it...the house will still be speeding along. Plans for week of 6/23 include, but are not necessarily limited to: completion of plumbing and electrical rough ins, inspection by Township of these rough ins, upon approval insulation of walls and ceilings, and installation of drywall by the end of the week.  We are reviewing the final lighting fixture selections which Jennifer has worked so diligently to pull together. We will be making the final selections on the wood trim throughout the house. 

2 comments:

  1. Great information, this information is necessary and essential for everyone. I am thankful for you for providing this kind of good information.
    entry doors Palatine

    ReplyDelete
  2. You have a genuine capacity to compose a substance that is useful for us. You have shared an amazing post aboutthermostatic bath shower tap.Much obliged to you for your endeavors in sharing such information with us.

    ReplyDelete